The proposal involves sequentially connecting ten heaters, one for each hive, to the secondary…

🌐 Original language: Russian 📰 Source: beejournal.ru
The proposal involves sequentially connecting ten heaters, one for each hive, to the secondary…
Illustration generated with AI

The proposal involves sequentially connecting ten heaters, one for each hive, to the secondary winding of a transformer with a power rating of about 120 W, providing 7 and 14 V outputs. These voltages are typical for rectifiers used to charge batteries. The heaters can operate on both AC and DC. Their performance is monitored using a 10 A ammeter in series with the heaters. If an ammeter is unavailable, a 2.5-3.5 V indicator lamp can be connected in parallel with one heater; the lamp will extinguish if the circuit breaks, and will glow dimly when functioning properly.

Read the full article at the source →

Source: beejournal.ru

This page is a short summary of the article; copyright belongs to the original source.

More beekeeping news

← All news
Dashboard
Apiary/Hives
Network
Market
News
Account
EN